We use cookies to track visitor statistics and personalise adverts. This info is shared with Google. Only use the site if you agree to this. OK, I agree
Librapix Link

Oil Rig Photos

Upload a Picture About this Site | Links | Random Pic | Advanced Search Home | Latest Additions | Contributors | Visitors
 
Sundowner Rig 805 Comes to KG Basin
Oil Rig Photos
No: 2597   Contributor: Satish Agrawal   Year: 2012   Country: Sri Lanka
Sundowner Rig 805 Comes to KG Basin

Nabors Drilling rig is on its way to Deen Dayal

Vol 15, PW 14 (26 Jan 2012) - Exploration & Production

A long-awaited ‘modular rig’ from US-based Nabors Drilling is set to finally arrive at GSPC’s Deen Dayal West field at eastern offshore.

Summary: Rig 805 is expected to reach DDW on Jan 28th. The transport vessel left Houston in Dec and reached Sri Lankan waters last Sunday. Assembly and mounting on the platform will take about 30 days, and drilling is expected to start by end February. Rig 805 is a 3000 hp rig with a 15,000psi BOP stack. It will complete the three development wells drilled by Aban Offshore jack-up Deep Driller-1 since Sept 12 last year, each drilled to 4500m. Rig 805 will also drill and complete 8 more development wells and tie back and complete the four old wells.
Picture added on 22 February 2012 at 10:47
Please add your comments about this picture using the form below.

Comments

Your Name

Your email address - this will be shown on the page and will allow the system to notify you of further comments added to this picture.
 

Sri Lanka

My Album Admin Login | Advertise on this Site | Terms & Copyright | Try our site about Trains