We use cookies to track visitor statistics and personalise adverts. This info is shared with Google. Only use the site if you agree to this. OK, I agree
Librapix Link

Oil Rig Photos

Upload a Picture About this Site | Links | Random Pic | Advanced Search Home | Latest Additions | Contributors | Visitors
 
Frøy Platform during removal
Oil Rig Photos
No: 340   Contributor: Unknown   Year: 2002   Country: Poland
Frøy Platform during removal

The Frøy topsides being lifted of the jacket. Note the cones under the deck section, which were used to position the topsides on the jacket during construction.
Picture added on 08 April 2007
This picture is in the following groups
Removal of the Frøy Gas Platform
add commentComments:
The cones are called Stabbing Guides.
Am I right in saying that the Froy Jacket was built at Nigg. I seem to remember installing /fighting with flexible piling grout hoses inside the legs at "altitude"and at one stage the winch for pulling them through developing a "problem" and the drum of hose (which was suspended on a Manitowoc 4100 Fly-Jib)nearly descending groundwards plus crane boom !Oops The hoses were all fastened to brackets on the inside of the legs with tie-wraps, and during pressure testing a few went "bang"

Added by George Paton on 04 September 2012.
Thats right George, the Froy jacket was indeed buit at Nigg. I was there as part of the KBR engineering team during the final stages of the project.

Added by on 18 December 2015.
Please add your comments about this picture using the form below.

Comments

Your Name

Your email address - this will be shown on the page and will allow the system to notify you of further comments added to this picture.
 

Poland

FPF1 departing TeesSeadrill West ProsperoPetrobaltic 'Baltic Beta'
My Album Admin Login | Advertise on this Site | Terms & Copyright | Try our site about Ambulances